Building Services Beds
Electrical Installation

News

OCT 2009

We have secured the following projects:

Further M&E refurb works at Royal Berkshire Hospital

M&E refurb works to 8no. Job Centres


SEP 2009


We have secured the following projects:

Further M&E refurb works at Royal Berkshire Hospital

M&E works to Winsor and Slough Royal Mail Sites

M&E refurb works to 13no. Job Centres

AUG 2009

We have secured the following projects:

M&E refurb works at Royal Berkshire Hospital

Fit-out project for Met Police in Dulwich.

M&E works to several schools during the summer break.

Design and Build M&E package to new build school in Barnet.

JUL 2009

We have secured the following projects:

Further fit-out at Ambassador Hse London.

Electrical refurb of Coombe Croft Library Tottenham.

Fire Alarm Installation at Sutton Fire Station.


JUN 2009


We have secured the following projects:

Fit - out project for Met Police in Enfield.

M&E refurb at Wimbledon Theatre.

APR / MAY 2009

We have secured the following projects:

Fit - out project for Met Police.

Air conditioning works at Lambeth Hospital

M&E refurb work to 4no. healthcare sites in Herts/Beds.


MAR 2009

We have secured the following projects:

M&E re-furb to 6no. healthcare sites in Luton, the project begins immediately and all sites run simultaneously.

Phase 2 of M&E fitout to office and comms area in Euston.

Further M&E fitout at Woolwich Barracks.

Three further Met police projects.


FEB 2009

We have secured the following projects:

Comms room and Lighting change to office block in central London.
Electrical project at Watford General Hospital

JAN 2009

We have achieved and accredited status on the Contractors Health and Safety Scheme (CHAS).

We have secured the following projects:

Woolwich Barracks - Mechanical, Electrical & Public Health installation to a new build medical centre.
Woolwich Barracks - Mechanical, Electrical & Public health installation to new operations room.

Adastral Park Ipswich - Fast track office fitout and lighting upgrade to 1200 positions.

Met Police - Further project in Colindale.

BT - Exchange upgrade works to 10no. sites.

BT - Refurb of motor transport site in Enfield.

Watford Football Club - Design, supply and install electrical works to 164no. dwellings and core areas which is to be used as keyworker accommodation for the adjacent hospital





NOV/DEC 2008

We have secured further BT Exchange upgrade works at Laindon, Sutton in Ashfield and Stevenage.

We have secured another two fit-out packages at Woolwich barracks.

Following a long track record of successful project we have become a Priority One Supplier for Crispin & Borst Rainham / TCL Granby.

OCT 2008

We have secured a mechanical and electrical fit-out package for the Met Police at a site in Morden.

We have secured an electrical installation package to four floors of new build office space at Bell Street Maidenhead, the project is due for completion March 09.

SEP 2008

We have secured a fit-out at Ambassador House in Maida Vale, the works comprise of generator, UPS, distribution, lighting and power, air-conditioning and ventilation.

AUG 2008

We have secured two more school extension projects at Stock and Fordham schools.

We have been awarded a further floor and reception area fit-out within Dukes Court from ISG.

We have been awarded a mechanical and electrical enabling works package from Wates Construction at Ashford College.

We have been awarded an office and comms room fit-out in Euston, the works comprise of a full M&E installation including comms room.

JUL 2008

Following the successful completion of numerous data centres for BT, we have been awarded a further site in Kettering.

We have been awarded a large office fit-out on two sites for pension company Hewitts, the work will take place at Prospect House in St. Albans and Breakspear Park in Hemel Hempstead.

APR 2008

We have been awarded a further M&E installation package for an office fit out and comms room at Adastral Park, Ipswich.

Following the successful completion of Hemel Hempstead Data Centre, we have been awarded a further Data Centre in Blackfriars.

We have been awarded several projects within Woolwich Barracks as part of an on going MOD project. We have been awarded the electrical installation works at Bournehall School and London Colney Children's Centre.

MAR 2008

We have been awarded an M&E package for a complete building refurb in North London. The project includes Heating, VRF system, Comms Room Cooling, Vent, Plumbing, Lighting, Power, Sub mains and UPS.

FEB 2008

We have been awarded a project to carry out ventilation to "The Hub", a catering facility within Adastral Park, Martlesham, Ipswich. The project involves a new energy efficient air handing plant and stainless steel ductwork and all associated controls.

We have been awarded a project to carry out mechanical and electrical services to a complete hospital ward at Lambeth Hospital, the works involve, heating, air conditioning, ventilation, controls, fire alarms, power, lighting and nurse call, the project is to be completed in November of this year.

JAN 2008

We have been awarded a project to refurbish the reception area for AIB in the city, London. The project involves decorative lighting and controls.

We have been awarded a project to refurbish a directors suite for BT in Blackfriars London.

We have been awarded a project for classroom refurbishment at New Bradwell School, Milton Keynes.

We have been awarded an office fit out in Dukes Street St James, London. The project for landlord Scottish Windows involves lighting, lighting controls. mechanical supplies and small power.